[TASK] Restructure nightly plans in stages a 50 jobs
The rearranged stages structure will prevent the host machines and also gerrit from being overwhelmed with a high amount of running jobs all at once. Instead, the equal size of each stage keeps the load on an average height, but it will increase the total runtime of a plan. We prefer stability over quick runs in nightlies. Resolves: #89865 Releases: master, 9.5, 8.7 Change-Id: Ib915053e83d087007242c05886619faf8d7cee0f Reviewed-on: https://review.typo3.org/c/Packages/TYPO3.CMS/+/62546 Tested-by:TYPO3com <noreply@typo3.com> Tested-by:
Anja Leichsenring <aleichsenring@ab-softlab.de> Reviewed-by:
Anja Leichsenring <aleichsenring@ab-softlab.de>
Please register or sign in to comment